Home/Blog/JD Edwards Lot Control and Traceability Explained
JD Edwards

JD Edwards Lot Control and Traceability Explained

How lot control works in JD Edwards EnterpriseOne: lot numbers, expiry dates, lot status codes, trace vs track, and best practices for recalls and audits.

Prefer to watch? This topic is also a short video on the Grace ITCS YouTube channel.

A customer calls. A batch you shipped is faulty. Which other customers received the same batch? With lot control in JD Edwards, you can answer in minutes, not days.

What lot control gives you

Lot control gives you four things.

  • Lot numbers. A lot number on every batch you receive or produce.
  • Expiry dates. Expiry dates, so old stock is never shipped by mistake.
  • Lot status. Lot status codes, to put a batch on hold or in quarantine.
  • Traceability. Full traceability, from the supplier to the customer.

A lot's journey through JDE

Let's follow a lot through JD Edwards.

  1. Receive. Raw material is received against a purchase order, and given a lot number.
  2. Inspect. It can be inspected before release.
  3. Issue to WO. It is issued to a work order.
  4. New finished lot. Production creates a new lot of finished goods, linked to the materials used.
  5. Ship. The finished lot is shipped to customers.
  6. Trace & track. Every step is recorded, so it can be traced later.

Lot status: who can use a batch?

Lot status decides whether a batch can be used.

  • Blank status. A blank status means the lot is available.
  • Any other status code. Any other status code puts it on hold, so it can't be committed to orders.
  • Example: Q. You define your own codes, for example Q for quarantine.
  • Lot Master (P4108). You can change the status for the whole lot in one place, the Lot Master, P4108.

Trace vs track

JD Edwards gives you two views. Trace looks backwards: which supplier lots went into this batch? Track looks forwards: which orders and customers received it? Together, they make a recall fast and precise.

Trace

  • Looks backwards
  • Where did it come from?
  • Supplier and ingredients

Track

  • Looks forwards
  • Where did it go?
  • Orders and customers

4 lot control best practices

Four best practices to finish.

  • Set shelf life on the item. Set shelf life days on the item, so expiry dates fill in automatically.
  • Commit by expiry date. Commit stock by expiry date, so the oldest lots ship first.
  • Quarantine on receipt. Receive critical materials into quarantine, and release them after inspection.
  • Practise a mock recall. Run a mock recall twice a year, to prove your traceability works.

Need a hand with this in your JD Edwards system?

Grace ITCS consultants set this up and support it every day. Talk to a senior consultant, or send us your question.

← All articles

Find Out Where Your JD Edwards Stands

Get your system checked free with a 3-minute System Efficiency Report, or book a 30-minute call with a senior consultant.