Prefer to watch? This topic is also a short video on the Grace ITCS YouTube channel.
Too much stock of one part, and not enough of another. Sound familiar? Kanban can fix that, and JD Edwards supports it. Let's see how.
Kanban basics
Kanban is a pull system with four parts.
- Card. A card, which signals that something needs refilling.
- Container. A container, holding a fixed quantity.
- Consuming location. A consuming location, where the parts are used.
- Supplying source. A supplying source, which refills the container.
The kanban loop in JDE
Here's the loop.
- Container empties. A container at the line becomes empty.
- Card checked out. Its kanban card is checked out in JD Edwards.
- Supply triggered. That triggers supply, from production, a supplier, or another warehouse.
- Container refilled. The container is refilled and moved back to the line.
- Card checked in. The card is checked in, ready for the next cycle.
Kanban vs MRP
MRP plans ahead from forecasts and orders. It suits variable demand, but takes more planning effort. Kanban simply refills what was used. It suits steady, repetitive demand, and is simple and visual. Many plants use both.
MRP
- Plans from forecasts
- Good for variable demand
- More planning effort
Kanban
- Refills what was used
- Good for steady demand
- Simple and visual
Need a hand with this in your JD Edwards system?
Grace ITCS consultants set this up and support it every day. Talk to a senior consultant, or send us your question.